![]() |
||||||||||
|
|
|
|
|
|
|
|||||
|
Eastern Trail Engineering Feasibility Study: Final Report The final Eastern Trail Engineering Feasibility Study: Final Report, published by Wilbur Smith Associates; Terrence J. DeWan & Associates, is available for download or viewing on this web site. This study and report were completed in April 2001. // Segments, etc. Eastern Trail: Scarborough/South Portland Connector September 2006 The Eastern Trail: Scarborough to South Portland Connector Study seeks to find a quality connection to fill an approximate one mile gap in the trail network between the Nonesuch River in Scarborough and the Wainwright Recreation Complex in South Portland. Study available in PDF ( ) here. (68 Pages. 5MB download, may take a while)
|
||||||||||
| © Eastern Trail Management District | Site designed by: Thomas Tripp | ||||||||||